Sewer Main Flushing

by | May 5, 2026 | Notice

⚠️ The Village of Valemount will be conducting sewer flushing operations starting on May 7 and continuing until May 15.
⚠️ This operation is to remove grit, sand, and gravel from sewer piping, as a preventative measure against sewer blockages, odour generation, and premature wear of mechanical components.
Please follow these precautions to prevent and/or control possible backflows from the sewer:
• Ensure all toilet seats are down
• Avoid using washroom facilities when Enviro Jet crews are within sight of your home
• Place towels around the base of toilets to absorb any overflow
• Plug all sinks when not in use
• Ensure washing machine hose is tightly connected
• If water does overflow a fixture, disinfect area, wash soiled towels/rags with bleach, and contact Public Works as soon as possible to prevent further overflows.
The Village apologizes for any inconvenience this procedure may cause; please understand it is a required portion of routine sewer maintenance. Direct any questions or concerns to the Public Works Superintendent at pworks@valemount.ca

Related News

Road Sweeping In Progress

Please be advised: Atlas Power Sweeping is in the village sweeping the roads from today and until Friday, May 8.  For the safety of the public and the contractor please use...

read more

Did you get the test alert?

The Village uses Voyent Alert! to notify residents and businesses during emergency events such as wildfire or flood. We issued a Voyent Alert! test alert on April 15. Subscribed,...

read more